Project titlelocationClientLinearYear
geotechnique reconnaissance works, in-situ and in laboratory tests of the fertilizer factory in Arzew. ORAN ORASCOM CONSTRUCTION INDUSTRIES ALGERIA  (EGYPT) 90 ml Jun-06
geotechnique reconnaissance works in cement factory for white ciment, in-situ and in laboratory tests at SIG Wilaya of Mascara. MASCARA ORASCOM CONSTRUCTION INDUSTRIES ALGERIA (EGYPT) 380 ml Jun-06
geotechnique reconnaissance works for high speed way LGV 2 from Boumdfaa to Djelfa, and in-situ and in laboratory tests MEDEA & DJELFA ASTALDI ALGERIA (ITALY) 420 ml Jun-06
geotechnique studies for the project : construction works for a bypass on Oued Djerr, including survey drilling, permeability onsite tests type Lugon and Lefran, and laboratory tests AFFROUN ZARUBEZHVODSTROY (RUSSIA) 150 ml Sep-06
geotechnique reconnaissance works for the workshop of  metal frames manufacture, in-situ and in laboratory tests at SIG Wilaya of Mascara MASCARA ORASCOM CONSTRUCTION INDUSTRIES ALGERIA ( EGYPT) 50 ml Oct-06
geotechnique reconnaissance works for the study of Electric railway double-track service of the line Birtouta – New Town Sidi Abdellah – Zeralda ALGER GETINSA (SPAIN) 800 ml Dec-06
geotechnique study of the railway service Saida / Moulay Slissen SAIDA SENER ( SPAIN ) 1 800 ml Feb-07
geotechnique reconnaissance works for the doubling of the way between Oued Sly and Yellel stations CHLEF SETI RAIL ( ALGERIA) 850 ml Mar-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest ; part Est Section 8 on 27 km MILA COJAAL (JAPAN) 2 500 ml Mar-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est Section 10 on 47 km SETIF COJAAL (JAPAN) 1 200 ml Mar-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 4 BRO on 49 km CONSTANTINE COJAAL (JAPAN) 4 000 ml Jun-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 11 on 38 km SETIF COJAAL (JAPAN) 2000 ml Jun-07
Geotechnical investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 5 on 15 km CONSTANTINE COJAAL (JAPAN) 2000 ml Jun-07
Geotechnique investigation works and laboratory tests for Algiers Metro Project ALGER METRO D’ALGE ENTREPRISE (ALGERIA) 400 ml Jun-07
Geotechnical investigation works and laboratory tests for the realization of the highway Est – part West BORDJ BOU ARRERIDJ & BOUIRA CRCC (CHINA) 400 ml juil-07
Seawater desalination power station (El Hamma) ALGER ORASCOM CONSTRUCTION (EGYPT) 100 ml Aug-07
Pressumetric tests for the project  of water transfer to the dam of TICHI HAF at Akbou in la Wilaya of Béjaia BEJAIA ASTALDI (ITALY) 150 ml Sept.-07
Realization of a storage and cleaning station in Rames, auto propelled at Karoubier level ALGER YAPI MERKAZI (TURQEY) 400 ml Sept.-07
geotechnical Investigations works & geophysical studies by resistivity method and laboratory tests for the project Pipeline between brn & regional storage center at Berkine HASSI MESSAOUD EPPM (TUNISIA) - -
Engineering Safety System at Sonatrach  works ARZEW HASSI RMEL EPPM (TUNISIA) 30 wells and 58 dynamic pentero Jan.-10
Geotechnical investigation works and laboratory tests for the Project of studies of a land base – Ammonium Factory – Arzew ARZEW ORASCOM CONSTRUCTION (EGYPT) 2000 ML Sep-08
A survey at Sea for the Ammonia factory – Arzew ARZEW ORASCOM CONSTRUCTION (EGYPT)   Sep-08
Geotechnical study for Ain Temouchent power plant construction project AIN TEMOUCHENT ORASCOM CONSTRUCTION (EGYPT) 230 ml Sep-08
Aluminium factory geotechnical study in Beni Saf Ain Temouchent Algeria AIN TEMOUCHENT BECHTEL(CANADA) 1500 ML -
Geotechnical investigation work and laboratory tests for the geotechnical exploration works realization project  at Annaba Port ANNABA UNICARBIDE(FRANCE) 100 ML Dec-08
Geotechnical investigation works realization for Bejaia Beni Mansour  railway line study BEJAIA GETINSA(SPAIN) 540 ml Jun.-10
Geotechnical investigation works realization for the railway line study in Biskra, Algeria BISKRA GETINSA(SPAIN) 500 ML Dec-08
Geotechnical investigation works for Dellys port basin study BOUMERDES MARITIME STUDIES LABORATORY (ALGERIA) 100 ml Dec-08
09 Stranding beaches Development and equipment Study ALGER BOUMERDES MARITIME STUDIES LABORATORY (ALGERIA) 27 wells and 135ml  dynamic penetromet Dec-09
Study of the stability of the cliff Tipaza TIPAZA MARITIME STUDIES LABORATORY (ALGERIA) 36 ml Jul.-09
Cement factory geotechnical study in Djelfa Algeria DJELFA ARESCO(EGYPT) 3500 ML 2007
Geotechnical investigation works and laboratory tests for Algiers TRAMWAY project ALGER ALSTOM (FRANCE) 40 ML Under way
Terga  Power Plant pumping station geotechnical study AIN TEMOUCHENT ORASCOM CONSTRUCTION (EGYPT)   2009
Geotechnical study and Menzellejmet site Soil laboratory tests realization HASSI MESSAOUD MENZEL LEJMET SAIPEM(ITALY) 1760 ML 2009
Gas pipeline GK3, geotechnical and geophysical study HASSI RMEL-EL KALA-SIKDA SAIPEM(ITALY) 900 ml Under way
South Algiers 3rd bypass geotechnical study ALGER – TIPAZA _ BOUMERDES TECSULT (CANADA) 2000 ml Under way
Geological and geotechnical   exploration and laboratory tests for the sanitation and protection against M’ZAB valley  rising (3rd section)  project execution study GHARDAIA EURL AMENHYD REALISATION 340 ml Completed
Geotechnical study and El Merk Project Offsite Facilities resistivity ( Lots 3 and 4) E L MERK ABB (ITALY) 300 ml 2009
Geotechnical surveys and CPT tests realization – Arzew- complementary works ARZEW SAIPEM (ITALY)   2009
Geotechnical study and GNL 3Z site soil laboratory tests realization ARZEW SAIPEM (ITALY) 3000 ml
Completed
Soil and  concrete quality control for Algiers tramway project , Bordj El- Kiffane maintenance station ALGER ORASCOM CONSTRUCTION (EGYPT)   Under way
Soil and  concrete quality control for Arzew ammonia factory construction project ARZEW ORASCOM CONSTRUCTION (EGYPT)   Under way
Soil and  concrete quality control for Terga power plant construction project AIN TIMOUCHENT ORASCOM CONSTRUCTION (EGYPT)   Under way
Soil and  concrete quality control for Skikda ammonia factory construction project SKIKDA ORASCOM CONSTRUCTION (EGYPT)   Under way

Realization of the geotechnical investigation and laboratory testing of ground Electric Line High Voltage at BRN - M7 Hassi Berkine

BRN ICC  1000 ml 2013

Realization of the geotechnical survey and soil testing laboratories of the Metro Project Lot1 Algiers El Harrach Airport Houary Boumediene

 ALGIERS  DOWHA KOREA  2800 ml  underway

Realization of the geotechnical survey and soil testing laboratories of the Metro Project Algiers Lot2 Ain Naadjaa Baraki

ALGIERS  IDOM SPAIN  1500 ml  underway

Realization of the geotechnical study and Tramway Project of soil testing laboratories Oran Lot C

 ORAN  DOWHA KOREA  1500 ml  underway

Realization of the geotechnical survey and soil testing laboratories Project Tramway Annaba

 ANNABA  DOWHA KOREA  -  2013

Realization of the geotechnical survey and soil testing laboratories Project of Central Electric Unicycle Biskra

 BISKRA  HANWHA  800 ml  Underway

Realization of the geotechnical study and laboratories Soil Road Project tests in Niger

 NIGER  Ministry of equipment  8000 ml  Underway

Realization of the geotechnical study and the project of soil testing laboratories Power Line High Voltage has Alrar

 AIN AMENAS  ICC group  500 ml  2014

Realization of the geotechnical study and the project of soil testing laboratories Power Line High Voltage has Tougourt

 HASSI MESSAOUD  ICC group  800 ml  2014

Realization of the geotechnical survey and soil testing laboratories of Power Line Project High Voltage MOSTAGANEM

 MOSTAGANEM  MELEK  800 ml  2014

Realization of the geotechnical investigation and laboratory testing of soil Power Line Project High Voltage AIN OUESSARA- WADI El Abtal

 TIARET  MELEK  600 ml  2014

Realization of the geotechnical survey and soil testing laboratories of Power Line Project High Voltage BRN

 HASSI BERKINE  ICC groupe  500 ml  2012

Realization of the geotechnical survey and soil testing laboratories of the Metro Project lot1 Algiers Houari Boumediene Airport El Harrach

 ALGER  DOWHA KOREA  3500 ml  2013

Realization of the geotechnical survey and soil testing laboratories of the Metro Project Algiers lot2 Ain Naadja -Baraki

 ALGER  IDOM  600 ml  2013

Realization of the geotechnical study and soil laboratory tests of the Metro Project box: 4 Algiers Dely Brahim Ouled Fayet- Cheraga-

 ALGER  FERCONSULT 3000 ml  2015

Realization of the geotechnical survey and soil testing laboratories Tramway Project ANNABA

 ANNABA  DOWHA KOREA  1000 ml  2013

Realization of the geotechnical survey and soil testing laboratories Tramway Project ORAN

 ORAN  DOWHA KOREA  1200 ml  2013

Realization of the geotechnical survey and soil testing laboratories of Central Electric Project BISKRA

 BISKRA  HANWHA  1500 ml 2014 

Realization of the geotechnical survey and soil testing laboratories of Central Electric Project CAP DJINAT

 BOUMERDES  DAEWOO  -  2014

Realization of the geotechnical survey and soil testing laboratories gas Complex Project AIN tsila

 ILLIZI  CBI  -  2015

Realization of the geotechnical survey and soil testing laboratories of the pharmaceutical plant project

 ALGER  PPF  200 ml  2014

Realization of the geotechnical study and the Project Terminal soil laboratory tests has Djen Djen Port Container

 JIJEL  DAEWOO  -  2014

Realization of the geotechnical study and Project soil laboratory tests WADI EL HARRACH

 ALGER  DAEWOO  -  2014

Realization of the geotechnical survey and soil testing laboratories of Central Electric Project MOSTAGANEM

 MOSTAGANEM  SAMSUNG  -  2014