Project titleLocationCustomerLinearYear
Study of preliminary design and detailed draft project for the East-West Highway Lot East Section 1 and Section 2 ANNABA & TAREF PCI (JAPON) 123 KM 2006-2007
 GPS survey control process by several polygonal in the Setif region up to the Tunisian border. SETIF COJAAL(JAPON) 38 KM Dec-06

Linear topographic drawing of trapdoors with an accuracy of less than two centimetres.

Algiers

SEAAL (ALGERIE)

- June -07
Study of performance for highway project EAST-WEST Lot East Section 1and Section 2. ANNABA & TAREF PCI (JAPON ) 123 KM Completed

Study ODA and execution VRD Cyber Park of SidiAbdellah, parts of the study conducted:
Topographical study on 100 ha
Geotechnical
Complete road Study
AEP and sanitation Study
Electricity, gas and telecoms Study

Algiers ATLAS (TURQUIE) 100 HA Partially completed

preliminary design of study and detailed design for the highway East-West project is Lot, Lot downtown Bouira to Zenouna

 Bouira a zenouna   SINOVO (CHINE)    80 km       2008

Control and monitoring of rehabilitation works of the roads after the floods of 80 Km in Cambodia with SCOTT WILSON (U.K.)

 CAMBODIA     

Ministry of Public Works and Transport (CAMBODIA)

 80km     2009

Study detailed draft for the rehabilitation and strengthening of the existing road to 2 lanes to 4/6 lanes on 165 Km Nellore TAMIL NADUET ANDHARA PRADESH in INDIA with SCOTT WILSON (U.K.)

 INDIA  

National Highways Authority of India

 165KM  2010

Control and monitoring of the road construction works EXPRESS 2 x 2 Channel Agadez - Ingall 150 KM of paved road - Niger

 NIGER  

DEPARTMENT OF PUBLIC WORKS

 150  2014

CONTROL AND MONITORING IMPLEMENTATION OF WORK The highway is lot west center 220km

 Algeria  Algeria  220    2011

CONTROL AND MONITORING OF REALIZATION Highway WORK IS batch is west 400 km

 Algeria    ANAS (ITALY)    400   IN PROGRESS... 
 CONTROL AND MONITORING IMPLEMENTATION OF WORK OF the 2nd Ring Road of Algiers about 65 km  Algeria  Louis Berger (France) 65   2011

STUDY APS, APD STUDIES AND IMPLEMENTING THE TREATMENT PLANT WASTEWATER CITY OF ORAN FOR 4 MILLION PEOPLE

Algeria

ARAB CONTRACTORS (EGYPT)

-    2009

CONTROL AND MONITORING OF THE WORK OF REALIZATION OF HIGHWAY EAST WEST Section ZENNOUNA - BBA ABOUT 18 KM

 Algeria  ANA  -   2010

APS STUDY AND APD NEW RAILWAY LINE ELECTRIFIED BIR TOUTA zeralda ON 35 KM

 Algeria  GETINSA (Spain)  35  2009

APS AND STUDY APD for the duplication of the railway Oued sly-yellel 100 km

 Algeria  SETIRAIL  100    2010

APS AND STUDY FOR APD Rail service saida Moulay lichen 125 km

 Algeria  SENER (Spain)  125  2010

APS AND STUDY FOR APD railway bypass of the city of Biskra 22 km

 Algeria     GETINSA (Spain)  22  2008

STUDY AND APS APD FOR SPLITTING THE RAILWAY LINE benimansour - bejaia ABOUT 100 KM

  Algeria  GETINSA (Spain) 100  2008

STUDY AND MONITORING OF TOURIST VILLAGE OF 303 BEDS ALGOUNA INCLUDED THE STUDY OF BUILDINGS, THE POOLS AND STATION WASTEWATER TREATMENT

 EGYPT  ORASCOM HOTEL HOLDING (EGYPTE)  -  2010

STUDY AND MONITORING OF TOURIST VILLAGE OF 426 BEDS HAYAT REGENCY TABA INCLUDED A STUDY OF BUILDINGS, POOL EL STATION WASTEWATER TREATMENT

 EGYPT  ORASCOM HOTEL HOLDING (EGYPTE)  -  2010

STUDY AND MONITORING THE SHERATON HOTEL MIRAMAR A GOUNA HURGHADA OF 343 BEDS INCLUDED THE STUDY OF BUILDINGS, POOL EL STATION WASTEWATER TREATMENT

 EGYPT  ORASCOM HOTEL HOLDING (EGYPT)  -  2010

STUDY OF STRUCTURE AND CIVIL ENGINEERING OF POWER PLANT BE terga AIN TEMOUCHENT

 Algeria   ORASCOM CONSTRUCTION & INDUSTRY (EGYPT)  -  2011

STUDY AND APS APD OF WATER SUPPLY OF DESALINATION STATION WATER SEA EL Kuriemat

 EGYPT  PCI (JAPAN)  -  2010

STUDY water management in agriculture THE SCOPE OF WESTERN DELTA EGYPT FOR AN AREA OF 8000 HECTARES

 EGYPT  SENER (Spain)  -  2012

APS STUDY AND ADMINISTRATIVE APD BLOCK IN BEIJING

 CHINA  SINOVO (CHINA)  2012

Study ODA and VRD execution of cyber park of Sidi Abdellah- parts of the study carried out topographic study of 100 Ha Geotechnical Study comprehensive road study AEP and Sanitation Study Study Electricity, Gas and Telecom

 ALGER  ATLAS (TURKEY)  100 hA  Completed

STUDY AND APS APD-WAY EXPRESS 2 x 2 Channel Agadez - Ingall 150 KM of dirt road - Niger

 NIGER  Direction of CIVIL WORKS  150 KM  2012

STUDY AND APS APD-WAY EXPRESS 2 x 2 Channel Agadez - zinder of 465 KM of dirt road - Niger

 NIGER  Direction of CIVIL WORKS  465 KM    2012


PORT FACILITIES

STUDY
Study of the Master Plan of the Maritime and Airport Infrastructure Development 2025

Study of the performance of fishing ports Realization work folder and Placentia El Djamila and Tipaza and the new Fishing port of El Kala

Phasing study of port Realization work of fishing and pleasure of El Kala, the laboratory LHI "study wave tank"

Development study of the ancient port of El Kala fishing port and marina

development study of a boom for Roulev 300 t at the port of Azeffoun
development study of an open platform at the coastguard in Skikda AP

development study of a fishing shelter Messida El Kala

development study of a shelter for fishing and boating to Hadjeret Ennous (W. Tipaza)


EXPERTISE OF PORT FACILITIES

Name of the study Location Linear
Expertise Maritime ports works Zemmouri & Dellys -
expert study and reinforcement of the oil station P2 Port of Arzew -
Expertise study of the main pier New Port of Skikda 2000 ml
Expertise of Breakwater Oil port Bethioua -
Expertise Maritime works Commercial port of Tenes -
Expertise of the main Northwest pier Port of Djendjen -
Expertise des quais n° 21, n° 25 et n° 35  Port of Algiers -
Expertise study of the large pier Old Port of Skikda -
Expertise study of the oil wharf P2 Port of Bejaia -
Diagnostic Study of petroleum stations Port of Bethioua -