| Project title | Location | Customer | Linear | Year |
|---|---|---|---|---|
| Study of preliminary design and detailed draft project for the East-West Highway Lot East Section 1 and Section 2 | ANNABA & TAREF | PCI (JAPON) | 123 KM | 2006-2007 |
| GPS survey control process by several polygonal in the Setif region up to the Tunisian border. | SETIF | COJAAL(JAPON) | 38 KM | Dec-06 |
|
Linear topographic drawing of trapdoors with an accuracy of less than two centimetres. |
Algiers |
SEAAL (ALGERIE) |
- | June -07 |
| Study of performance for highway project EAST-WEST Lot East Section 1and Section 2. | ANNABA & TAREF | PCI (JAPON ) | 123 KM | Completed |
|
Study ODA and execution VRD Cyber Park of SidiAbdellah, parts of the study conducted: |
Algiers | ATLAS (TURQUIE) | 100 HA | Partially completed |
|
preliminary design of study and detailed design for the highway East-West project is Lot, Lot downtown Bouira to Zenouna |
Bouira a zenouna | SINOVO (CHINE) | 80 km | 2008 |
|
Control and monitoring of rehabilitation works of the roads after the floods of 80 Km in Cambodia with SCOTT WILSON (U.K.) |
CAMBODIA |
Ministry of Public Works and Transport (CAMBODIA) |
80km | 2009 |
|
Study detailed draft for the rehabilitation and strengthening of the existing road to 2 lanes to 4/6 lanes on 165 Km Nellore TAMIL NADUET ANDHARA PRADESH in INDIA with SCOTT WILSON (U.K.) |
INDIA |
National Highways Authority of India |
165KM | 2010 |
|
Control and monitoring of the road construction works EXPRESS 2 x 2 Channel Agadez - Ingall 150 KM of paved road - Niger |
NIGER |
DEPARTMENT OF PUBLIC WORKS |
150 | 2014 |
|
CONTROL AND MONITORING IMPLEMENTATION OF WORK The highway is lot west center 220km |
Algeria | Algeria | 220 | 2011 |
|
CONTROL AND MONITORING OF REALIZATION Highway WORK IS batch is west 400 km |
Algeria | ANAS (ITALY) | 400 | IN PROGRESS... |
| CONTROL AND MONITORING IMPLEMENTATION OF WORK OF the 2nd Ring Road of Algiers about 65 km | Algeria | Louis Berger (France) | 65 | 2011 |
|
STUDY APS, APD STUDIES AND IMPLEMENTING THE TREATMENT PLANT WASTEWATER CITY OF ORAN FOR 4 MILLION PEOPLE |
Algeria |
ARAB CONTRACTORS (EGYPT) |
- | 2009 |
|
CONTROL AND MONITORING OF THE WORK OF REALIZATION OF HIGHWAY EAST WEST Section ZENNOUNA - BBA ABOUT 18 KM |
Algeria | ANA | - | 2010 |
|
APS STUDY AND APD NEW RAILWAY LINE ELECTRIFIED BIR TOUTA zeralda ON 35 KM |
Algeria | GETINSA (Spain) | 35 | 2009 |
|
APS AND STUDY APD for the duplication of the railway Oued sly-yellel 100 km |
Algeria | SETIRAIL | 100 | 2010 |
|
APS AND STUDY FOR APD Rail service saida Moulay lichen 125 km |
Algeria | SENER (Spain) | 125 | 2010 |
|
APS AND STUDY FOR APD railway bypass of the city of Biskra 22 km |
Algeria | GETINSA (Spain) | 22 | 2008 |
|
STUDY AND APS APD FOR SPLITTING THE RAILWAY LINE benimansour - bejaia ABOUT 100 KM |
Algeria | GETINSA (Spain) | 100 | 2008 |
|
STUDY AND MONITORING OF TOURIST VILLAGE OF 303 BEDS ALGOUNA INCLUDED THE STUDY OF BUILDINGS, THE POOLS AND STATION WASTEWATER TREATMENT |
EGYPT | ORASCOM HOTEL HOLDING (EGYPTE) | - | 2010 |
|
STUDY AND MONITORING OF TOURIST VILLAGE OF 426 BEDS HAYAT REGENCY TABA INCLUDED A STUDY OF BUILDINGS, POOL EL STATION WASTEWATER TREATMENT |
EGYPT | ORASCOM HOTEL HOLDING (EGYPTE) | - | 2010 |
|
STUDY AND MONITORING THE SHERATON HOTEL MIRAMAR A GOUNA HURGHADA OF 343 BEDS INCLUDED THE STUDY OF BUILDINGS, POOL EL STATION WASTEWATER TREATMENT |
EGYPT | ORASCOM HOTEL HOLDING (EGYPT) | - | 2010 |
|
STUDY OF STRUCTURE AND CIVIL ENGINEERING OF POWER PLANT BE terga AIN TEMOUCHENT |
Algeria | ORASCOM CONSTRUCTION & INDUSTRY (EGYPT) | - | 2011 |
|
STUDY AND APS APD OF WATER SUPPLY OF DESALINATION STATION WATER SEA EL Kuriemat |
EGYPT | PCI (JAPAN) | - | 2010 |
|
STUDY water management in agriculture THE SCOPE OF WESTERN DELTA EGYPT FOR AN AREA OF 8000 HECTARES |
EGYPT | SENER (Spain) | - | 2012 |
|
APS STUDY AND ADMINISTRATIVE APD BLOCK IN BEIJING |
CHINA | SINOVO (CHINA) | - | 2012 |
|
Study ODA and VRD execution of cyber park of Sidi Abdellah- parts of the study carried out topographic study of 100 Ha Geotechnical Study comprehensive road study AEP and Sanitation Study Study Electricity, Gas and Telecom |
ALGER | ATLAS (TURKEY) | 100 hA | Completed |
|
STUDY AND APS APD-WAY EXPRESS 2 x 2 Channel Agadez - Ingall 150 KM of dirt road - Niger |
NIGER | Direction of CIVIL WORKS | 150 KM | 2012 |
|
STUDY AND APS APD-WAY EXPRESS 2 x 2 Channel Agadez - zinder of 465 KM of dirt road - Niger |
NIGER | Direction of CIVIL WORKS | 465 KM | 2012 |
PORT FACILITIES
| STUDY |
| Study of the Master Plan of the Maritime and Airport Infrastructure Development 2025 |
|
Study of the performance of fishing ports Realization work folder and Placentia El Djamila and Tipaza and the new Fishing port of El Kala |
| Phasing study of port Realization work of fishing and pleasure of El Kala, the laboratory LHI "study wave tank" |
|
Development study of the ancient port of El Kala fishing port and marina |
| development study of a boom for Roulev 300 t at the port of Azeffoun |
| development study of an open platform at the coastguard in Skikda AP |
|
development study of a fishing shelter Messida El Kala |
| development study of a shelter for fishing and boating to Hadjeret Ennous (W. Tipaza) |
EXPERTISE OF PORT FACILITIES
| Name of the study | Location | Linear |
| Expertise Maritime ports works | Zemmouri & Dellys | - |
| expert study and reinforcement of the oil station P2 | Port of Arzew | - |
| Expertise study of the main pier | New Port of Skikda | 2000 ml |
| Expertise of Breakwater | Oil port Bethioua | - |
| Expertise Maritime works | Commercial port of Tenes | - |
| Expertise of the main Northwest pier | Port of Djendjen | - |
| Expertise des quais n° 21, n° 25 et n° 35 | Port of Algiers | - |
| Expertise study of the large pier | Old Port of Skikda | - |
| Expertise study of the oil wharf P2 | Port of Bejaia | - |
| Diagnostic Study of petroleum stations | Port of Bethioua | - |