Project titlelocationClientLinearYear
geotechnique reconnaissance works, in-situ and in laboratory tests of the fertilizer factory in Arzew. ORAN ORASCOM CONSTRUCTION INDUSTRIES ALGERIA (EGYPT) 90 ml Jun-06
geotechnique reconnaissance works in cement factory for white ciment, in-situ and in laboratory tests at SIG Wilaya of Mascara. MASCARA ORASCOM CONSTRUCTION INDUSTRIES ALGERIA (EGYPT) 380 ml Jun-06
geotechnique reconnaissance works for high speed way LGV 2 from Boumdfaa to Djelfa, and in-situ and in laboratory tests MEDEA & DJELFA ASTALDI ALGERIA (ITALY) 420 ml Jun-06
geotechnique studies for the project : construction works for a bypass on Oued Djerr, including survey drilling, permeability onsite tests type Lugon and Lefran, and laboratory tests AFFROUN ZARUBEZHVODSTROY (RUSSIA) 150 ml Sep-06
geotechnique reconnaissance works for the workshop of metal frames manufacture, in-situ and in laboratory tests at SIG Wilaya of Mascara MASCARA ORASCOM CONSTRUCTION INDUSTRIES ALGERIA ( EGYPT) 50 ml Oct-06
geotechnique reconnaissance works for the study of Electric railway double-track service of the line Birtouta – New Town Sidi Abdellah – Zeralda ALGER GETINSA (SPAIN) 800 ml Dec-06
geotechnique study of the railway service Saida / Moulay Slissen SAIDA SENER ( SPAIN ) 1 800 ml Feb-07
geotechnique reconnaissance works for the doubling of the way between Oued Sly and Yellel stations CHLEF SETI RAIL ( ALGERIA) 850 ml Mar-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest ; part Est Section 8 on 27 km MILA COJAAL (JAPAN) 2 500 ml Mar-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est Section 10 on 47 km SETIF COJAAL (JAPAN) 1 200 ml Mar-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 4 BRO on 49 km CONSTANTINE COJAAL (JAPAN) 4 000 ml Jun-07
Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 11 on 38 km SETIF COJAAL (JAPAN) 2000 ml Jun-07
Geotechnical investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 5 on 15 km CONSTANTINE COJAAL (JAPAN) 2000 ml Jun-07
Geotechnique investigation works and laboratory tests for Algiers Metro Project ALGER METRO D’ALGE ENTREPRISE (ALGERIA) 400 ml Jun-07
Geotechnical investigation works and laboratory tests for the realization of the highway Est – part West BORDJ BOU ARRERIDJ & BOUIRA CRCC (CHINA) 400 ml juil-07
Seawater desalination power station (El Hamma) ALGER ORASCOM CONSTRUCTION (EGYPT) 100 ml Aug-07
Pressumetric tests for the project of water transfer to the dam of TICHI HAF at Akbou in la Wilaya of Béjaia BEJAIA ASTALDI (ITALY) 150 ml Sept.-07
Realization of a storage and cleaning station in Rames, auto propelled at Karoubier level ALGER YAPI MERKAZI (TURQEY) 400 ml Sept.-07
geotechnical Investigations works & geophysical studies by resistivity method and laboratory tests for the project Pipeline between brn & regional storage center at Berkine HASSI MESSAOUD EPPM (TUNISIA) - -
Engineering Safety System at Sonatrach works ARZEW HASSI RMEL EPPM (TUNISIA) 30 wells and 58 dynamic pentero Jan.-10
Geotechnical investigation works and laboratory tests for the Project of studies of a land base – Ammonium Factory – Arzew ARZEW ORASCOM CONSTRUCTION (EGYPT) 2000 ML Sep-08
A survey at Sea for the Ammonia factory – Arzew ARZEW ORASCOM CONSTRUCTION (EGYPT)   Sep-08
Geotechnical study for Ain Temouchent power plant construction project AIN TEMOUCHENT ORASCOM CONSTRUCTION (EGYPT) 230 ml Sep-08
Aluminium factory geotechnical study in Beni Saf Ain Temouchent Algeria AIN TEMOUCHENT BECHTEL(CANADA) 1500 ML -
Geotechnical investigation work and laboratory tests for the geotechnical exploration works realization project at Annaba Port ANNABA UNICARBIDE(FRANCE) 100 ML Dec-08
Geotechnical investigation works realization for Bejaia Beni Mansour railway line study BEJAIA GETINSA(SPAIN) 540 ml Jun.-10
Geotechnical investigation works realization for the railway line study in Biskra, Algeria BISKRA GETINSA(SPAIN) 500 ML Dec-08
Geotechnical investigation works for Dellys port basin study BOUMERDES MARITIME STUDIES LABORATORY (ALGERIA) 100 ml Dec-08
09 Stranding beaches Development and equipment Study ALGER BOUMERDES MARITIME STUDIES LABORATORY (ALGERIA) 27 wells and 135ml dynamic penetromet Dec-09
Study of the stability of the cliff Tipaza TIPAZA MARITIME STUDIES LABORATORY (ALGERIA) 36 ml Jul.-09
Cement factory geotechnical study in Djelfa Algeria DJELFA ARESCO(EGYPT) 3500 ML 2007
Geotechnical investigation works and laboratory tests for Algiers TRAMWAY project ALGER ALSTOM (FRANCE) 40 ML Under way
Terga Power Plant pumping station geotechnical study AIN TEMOUCHENT ORASCOM CONSTRUCTION (EGYPT)   2009
Geotechnical study and Menzellejmet site Soil laboratory tests realization HASSI MESSAOUD MENZEL LEJMET SAIPEM(ITALY) 1760 ML 2009
Gas pipeline GK3, geotechnical and geophysical study HASSI RMEL-EL KALA-SIKDA SAIPEM(ITALY) 900 ml Under way
South Algiers 3rd bypass geotechnical study ALGER – TIPAZA _ BOUMERDES TECSULT (CANADA) 2000 ml Under way
Geological and geotechnical exploration and laboratory tests for the sanitation and protection against M’ZAB valley rising (3rd section) project execution study GHARDAIA EURL AMENHYD REALISATION 340 ml Completed
Geotechnical study and El Merk Project Offsite Facilities resistivity ( Lots 3 and 4) E L MERK ABB (ITALY) 300 ml 2009
Geotechnical surveys and CPT tests realization – Arzew- complementary works ARZEW SAIPEM (ITALY)   2009
Geotechnical study and GNL 3Z site soil laboratory tests realization ARZEW SAIPEM (ITALY) 3000 ml
Completed
Soil and concrete quality control for Algiers tramway project , Bordj El- Kiffane maintenance station ALGER ORASCOM CONSTRUCTION (EGYPT)   Under way
Soil and concrete quality control for Arzew ammonia factory construction project ARZEW ORASCOM CONSTRUCTION (EGYPT)   Under way
Soil and concrete quality control for Terga power plant construction project AIN TIMOUCHENT ORASCOM CONSTRUCTION (EGYPT)   Under way
Soil and concrete quality control for Skikda ammonia factory construction project SKIKDA ORASCOM CONSTRUCTION (EGYPT)   Under way