| Project title | location | Client | Linear | Year |
| geotechnique reconnaissance works, in-situ and in laboratory tests of the fertilizer factory in Arzew. |
ORAN |
ORASCOM CONSTRUCTION INDUSTRIES ALGERIA (EGYPT) |
90 ml |
Jun-06 |
| geotechnique reconnaissance works in cement factory for white ciment, in-situ and in laboratory tests at SIG Wilaya of Mascara. |
MASCARA |
ORASCOM CONSTRUCTION INDUSTRIES ALGERIA (EGYPT) |
380 ml |
Jun-06 |
| geotechnique reconnaissance works for high speed way LGV 2 from Boumdfaa to Djelfa, and in-situ and in laboratory tests |
MEDEA & DJELFA |
ASTALDI ALGERIA (ITALY) |
420 ml |
Jun-06 |
| geotechnique studies for the project : construction works for a bypass on Oued Djerr, including survey drilling, permeability onsite tests type Lugon and Lefran, and laboratory tests |
AFFROUN |
ZARUBEZHVODSTROY (RUSSIA) |
150 ml |
Sep-06 |
| geotechnique reconnaissance works for the workshop of metal frames manufacture, in-situ and in laboratory tests at SIG Wilaya of Mascara |
MASCARA |
ORASCOM CONSTRUCTION INDUSTRIES ALGERIA ( EGYPT) |
50 ml |
Oct-06 |
| geotechnique reconnaissance works for the study of Electric railway double-track service of the line Birtouta – New Town Sidi Abdellah – Zeralda |
ALGER |
GETINSA (SPAIN) |
800 ml |
Dec-06 |
| geotechnique study of the railway service Saida / Moulay Slissen |
SAIDA |
SENER ( SPAIN ) |
1 800 ml |
Feb-07 |
| geotechnique reconnaissance works for the doubling of the way between Oued Sly and Yellel stations |
CHLEF |
SETI RAIL ( ALGERIA) |
850 ml |
Mar-07 |
| Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest ; part Est Section 8 on 27 km |
MILA |
COJAAL (JAPAN) |
2 500 ml |
Mar-07 |
| Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est Section 10 on 47 km |
SETIF |
COJAAL (JAPAN) |
1 200 ml |
Mar-07 |
| Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 4 BRO on 49 km |
CONSTANTINE |
COJAAL (JAPAN) |
4 000 ml |
Jun-07 |
| Geotechnique investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 11 on 38 km |
SETIF |
COJAAL (JAPAN) |
2000 ml |
Jun-07 |
| Geotechnical investigation works and laboratory tests for the realization of the highway Est – Ouest – part Est, Section 5 on 15 km |
CONSTANTINE |
COJAAL (JAPAN) |
2000 ml |
Jun-07 |
| Geotechnique investigation works and laboratory tests for Algiers Metro Project |
ALGER |
METRO D’ALGE ENTREPRISE (ALGERIA) |
400 ml |
Jun-07 |
| Geotechnical investigation works and laboratory tests for the realization of the highway Est – part West |
BORDJ BOU ARRERIDJ & BOUIRA |
CRCC (CHINA) |
400 ml |
juil-07 |
| Seawater desalination power station (El Hamma) |
ALGER |
ORASCOM CONSTRUCTION (EGYPT) |
100 ml |
Aug-07 |
| Pressumetric tests for the project of water transfer to the dam of TICHI HAF at Akbou in la Wilaya of Béjaia |
BEJAIA |
ASTALDI (ITALY) |
150 ml |
Sept.-07 |
| Realization of a storage and cleaning station in Rames, auto propelled at Karoubier level |
ALGER |
YAPI MERKAZI (TURQEY) |
400 ml |
Sept.-07 |
| geotechnical Investigations works & geophysical studies by resistivity method and laboratory tests for the project Pipeline between brn & regional storage center at Berkine |
HASSI MESSAOUD |
EPPM (TUNISIA) |
- |
- |
| Engineering Safety System at Sonatrach works |
ARZEW HASSI RMEL |
EPPM (TUNISIA) |
30 wells and 58 dynamic pentero |
Jan.-10 |
| Geotechnical investigation works and laboratory tests for the Project of studies of a land base – Ammonium Factory – Arzew |
ARZEW |
ORASCOM CONSTRUCTION (EGYPT) |
2000 ML |
Sep-08 |
| A survey at Sea for the Ammonia factory – Arzew |
ARZEW |
ORASCOM CONSTRUCTION (EGYPT) |
|
Sep-08 |
| Geotechnical study for Ain Temouchent power plant construction project |
AIN TEMOUCHENT |
ORASCOM CONSTRUCTION (EGYPT) |
230 ml |
Sep-08 |
| Aluminium factory geotechnical study in Beni Saf Ain Temouchent Algeria |
AIN TEMOUCHENT |
BECHTEL(CANADA) |
1500 ML |
- |
| Geotechnical investigation work and laboratory tests for the geotechnical exploration works realization project at Annaba Port |
ANNABA |
UNICARBIDE(FRANCE) |
100 ML |
Dec-08 |
| Geotechnical investigation works realization for Bejaia Beni Mansour railway line study |
BEJAIA |
GETINSA(SPAIN) |
540 ml |
Jun.-10 |
| Geotechnical investigation works realization for the railway line study in Biskra, Algeria |
BISKRA |
GETINSA(SPAIN) |
500 ML |
Dec-08 |
| Geotechnical investigation works for Dellys port basin study |
BOUMERDES |
MARITIME STUDIES LABORATORY (ALGERIA) |
100 ml |
Dec-08 |
| 09 Stranding beaches Development and equipment Study |
ALGER BOUMERDES |
MARITIME STUDIES LABORATORY (ALGERIA) |
27 wells and 135ml dynamic penetromet |
Dec-09 |
| Study of the stability of the cliff Tipaza |
TIPAZA |
MARITIME STUDIES LABORATORY (ALGERIA) |
36 ml |
Jul.-09 |
| Cement factory geotechnical study in Djelfa Algeria |
DJELFA |
ARESCO(EGYPT) |
3500 ML |
2007 |
| Geotechnical investigation works and laboratory tests for Algiers TRAMWAY project |
ALGER |
ALSTOM (FRANCE) |
40 ML |
Under way |
| Terga Power Plant pumping station geotechnical study |
AIN TEMOUCHENT |
ORASCOM CONSTRUCTION (EGYPT) |
|
2009 |
| Geotechnical study and Menzellejmet site Soil laboratory tests realization |
HASSI MESSAOUD MENZEL LEJMET |
SAIPEM(ITALY) |
1760 ML |
2009 |
| Gas pipeline GK3, geotechnical and geophysical study |
HASSI RMEL-EL KALA-SIKDA |
SAIPEM(ITALY) |
900 ml |
Under way |
| South Algiers 3rd bypass geotechnical study |
ALGER – TIPAZA _ BOUMERDES |
TECSULT (CANADA) |
2000 ml |
Under way |
| Geological and geotechnical exploration and laboratory tests for the sanitation and protection against M’ZAB valley rising (3rd section) project execution study |
GHARDAIA |
EURL AMENHYD REALISATION |
340 ml |
Completed |
| Geotechnical study and El Merk Project Offsite Facilities resistivity ( Lots 3 and 4) |
E L MERK |
ABB (ITALY) |
300 ml |
2009 |
| Geotechnical surveys and CPT tests realization – Arzew- complementary works |
ARZEW |
SAIPEM (ITALY) |
|
2009 |
| Geotechnical study and GNL 3Z site soil laboratory tests realization |
ARZEW |
SAIPEM (ITALY) |
3000 ml |
|
| Soil and concrete quality control for Algiers tramway project , Bordj El- Kiffane maintenance station |
ALGER |
ORASCOM CONSTRUCTION (EGYPT) |
|
Under way |
| Soil and concrete quality control for Arzew ammonia factory construction project |
ARZEW |
ORASCOM CONSTRUCTION (EGYPT) |
|
Under way |
| Soil and concrete quality control for Terga power plant construction project |
AIN TIMOUCHENT |
ORASCOM CONSTRUCTION (EGYPT) |
|
Under way |
| Soil and concrete quality control for Skikda ammonia factory construction project |
SKIKDA |
ORASCOM CONSTRUCTION (EGYPT) |
|
Under way |